Extended Matrix

Extended Matrix Development Projects

← Back to Roadmap
DP-92

GIS in the em.json

New Domains v1.6 s3DgraphyEMStudio

Description

Declared on 17 November 2026: built before it had a development project.

The map of the excavation and the matrix belong to the same record: a trench outline is a document, with its date and its author, not a loose layer in another program.

Evidence: s3Dgraphy gis/ (3f6e608, 6 Nov 2026; cf78595, 15 Nov 2026); EMStudio gis-space.ts, gis-scene.ts; report 2026-11-15-REPORT-gis-documenti. Tried on real Templu Mare shapefiles (EPSG:31700).

Status

Built — real-case test and documentation pending for the beta

Target EM Version

1.6

Impacts

s3DgraphyEMStudio

Components

  • Four formats read without GDAL
  • Footprints of sites, trenches and cuts
  • GIS data as documents
  • Ground from DEM and orthophoto, stamped contour lines
  • GIS button in the EMStudio Space

Key Study

Templu Mare

Notes

Built; a companion of the georeferencing pipeline (DP-56).